On-Demand Webinars

American City & County on-demand events allow you to access archived webinars when it is convenient for your schedule. These free sessions are available for viewing 24/7.

More Webinars

Featured White Papers

The Advantages of BIM for Government Building Performance Analysis
Learn why Building Information Modeling (BIM) is an invaluable tool for evaluating energy savings performance contracts (ESPCs).

ShotSpotter Acoustic Surveillance System Leads to Violent Crime Reductions, Convictions
The ShotSpotter Gunshot Location SystemŽ (GLS) captures critical forensic evidence that assists…

More White Papers

Municipal Cost Index

The Municipal Cost Index, developed exclusively by American City & County, is designed to show the effects of inflation on the cost of providing Municipal services.

Municipal Cost Index graph

View the Municipal Cost Index and other indexes

Popular Articles

Resources

Latest Jobs

EROSION CONTROL/Blanket helps city meet NPDES requirements


       

In March 2001, construction sites at two Dalton, Ga., schools were found to be in violation of the state's NPDES regulations. Officials with the state Environmental Protection Division cited the city because silt-laden water was running off the sites into nearby streams. According to the EPA, soil erosion and sedimentation are two of the primary problems associated with water pollution.

The city was using best management practices — installing silt fencing around the borders of the properties to help control erosion and placing straw bales around the storm drainage system to filter the runoff — as called for in its NPDES permit. However, those defensive measures taken to contain the erosion were insufficient for stabilizing steep slopes.

State officials issued a stop work order on the construction sites until the city could implement slope stabilization measures. The city chose to use a straw erosion control blanket, part of the Landlok family of temporary and permanent erosion control materials manufactured by Chickamauga, Ga.-based SI Geosolutions. The temporary blanket, which eventually biodegrades, is designed to protect soil and seeds until vegetation is established. It was installed on the site's exposed slopes and then seeded.

The resulting site improvements allowed construction at Dalton Middle School and Park Creek Elementary School to resume within six months of the stop work order. The state EPD did not impose any fines on the city, but the state and the city had to work out standards for future projects to avoid similar situations.

“The government is satisfied with the steps we've taken to fix the problems,” says Dalton City Administrator Butch Sanders. “The community has been disappointed that the project was delayed, but I think everyone realizes that we've gotten a good dose of education when it comes to soil erosion measures. We won't find ourselves in this situation again.”


Acceptable Use Policy
blog comments powered by Disqus

Want to use this article? Click here for options!
© 2009 Penton Media Inc.

Register now for Bank of America's June 18 Webinar "Using Alternatives to Finance Essential Projects and Green Initiatives"
  • May 2009
  • April 2009
  • March 2009
  • February 2009
  • January 2009
  • December 2008
  • November 2008

Browse Back Issues